Going Underground in Glasgow
Tarmac supplies 2600 tonnes of Pozament specialist set accelerated tunnelling grout to Freyssinet for Glasgow Underground improvement works.

Cemrok Spray Concrete – Modern Mix
Reducing material waste and application downtime with high performance spray concrete.

Naples Underground
Over 5 kilometres of Hydrotite CJ were used to waterproof and seal construction joints and platform tunnel sections

Preston Sewage Interceptor Tunnel
Pozament made regular bulk deliveries to sites where access and offloading were often a challenge, while tailoring loads to meet anticipated needs.

Ashford Crescent Flood Alleviation Scheme
Balfour Beatty Utilities were appointed to construct a series of surface water drainage ducts and a collection tank. The collection tank was a 20m diameter, 14m deep vertical shaft constructed from precast concrete segments. Once in place the concrete segments are surrounded by grout, this fills and seals any voids.
