Going Underground in Glasgow

Tarmac supplies 2600 tonnes of Pozament specialist set accelerated tunnelling grout to Freyssinet for Glasgow Underground improvement works.

Read More

Going Underground in Glasgow

Cemrok Spray Concrete – Modern Mix

Reducing material waste and application downtime with high performance spray concrete.

Read More

Cemrok Spray Concrete – Modern Mix

Naples Underground

Over 5 kilometres of Hydrotite CJ were used to waterproof and seal construction joints and platform tunnel sections

Read More

Naples Underground

Preston Sewage Interceptor Tunnel

Pozament made regular bulk deliveries to sites where access and offloading were often a challenge, while tailoring loads to meet anticipated needs.

Read More

Preston Sewage Interceptor Tunnel

Ashford Crescent Flood Alleviation Scheme

Balfour Beatty Utilities were appointed to construct a series of surface water drainage ducts and a collection tank. The collection tank was a 20m diameter, 14m deep vertical shaft constructed from precast concrete segments. Once in place the concrete segments are surrounded by grout, this fills and seals any voids.

Read More

Ashford Crescent Flood Alleviation Scheme